Latest Post
Showing posts with label eMO. Show all posts
Showing posts with label eMO. Show all posts

Capturing Mobile Telephone Number for the booking of eMO

To view Directorate Memo No. 3-4/2014-PO dated 3/2/2015, please CLICK HERE.

EMO - GENERAL PRINTING ERROR AFTER UPGRADE 7.9.1


Meghdoot 7 Update 9.1 EMO Module Printing Error

Issues Listed

After Update MM 7.9.1 ,In Some Offices ,the following eMO problem faced.
For every single eMO print in Operator login -> 2 eMO print out paper is coming (the same eMO no)
For every single eMO reprint in Supervisor login -> 3 eMO print out paper is coming (the same eMO no)

Even change the printer driver, printer (Epson LX300,LX1170,Laser Printer) or given print out from any systems, the same issue exists.

Solution

  1. Take eMO db backup
  2. Download the attached exl and run it through script tool
  3. Finally check the eMO print out
  4. Still eMO printing issue persists, Please Contact CEPT

Download Delete Duplicate EMO Office Name

EMO TOOL FOR INQUIRY OF EMO BOOKED / RECEIVED


EMO Inquiry Tool By Karungaran

Download attached eMO Tool to Inquire the Booked or received eMO at your office. 

Download EMO Tool

Features

  1. eMO Enquiry - Booked / received eMO enquiry
  2. BO eMOs Paid Summary - Reports generate for eMO Paid summary at BO

Developed by:


R.Karunagaran, System Manager,
Tirupattur HPO – 635601   Mobile : 9894213404, Mail : Karunagaran78@Gmail.com

EMO CLIENT ISSUES AND SOLUTION FOR CBS AND NON CBS OFFICES

EMO Client Issues

CBS Offices / newly configured non cbs offices may facing the issues with eMO Client communication module. It show the following error message while executing...

Error 1

[703]could not find stored procedure ‘Msg_GetMessageRecordset_703’.

Error 2

[704] could not find stored procedure ‘Msg_GetMessageRecordset_704’

Solution For EMO Client Issues For CBS Offices

Kindly follow the procedure to update the configuration of eMO Client in all CBS Offices.
  1. Open eMO Communication > change the Sanchay Post server Details > Select Not available option.
  2. Click on OK

Solution For Non CBS Offices:For Fresh installation,

Configure Sanchay Post using version 7.0 and Download the below patch and upgrade NREGA database.

Better to Restore already created NREGAEMO database to prevent from the above error. To update the tables of NREGAEMO database. 

Disaster recovery data of eMO


STEPS FOR UPDATING PAID DATE OF eMO

 

1.       The Supervisor has to request for disaster recovery data through Transactions > Disaster Recovery > Disaster request data Menu Option. There he has to select the pincode for which disaster data is required and enter remarks.

 

2.       Once eMO Communication is run, disaster request will be sent to central server and the data for disaster recovery will be received in the next or subsequent calls.

 

3.       Once the data for disaster recovery is received from central server, the Operator has to go to DataEntry >Disaster recovery > Disaster paid entry option. There he has to select the office for which disaster paid entry is to be done. Select PNR number and enter the paid particulars.

 

4.       Thereafter, the supervisor has to perform disaster paid verification in respect of disaster paid entries done by the operator through Transactions > Disaster Recovery > Disaster paid verification option.

 

5.       After this when eMO Communication is run, disaster paid entries data will be transmitted to Server and paid data will be updated.
 
Copyright © 2014. wopostbank - All Rights Reserved
Proudly powered by Blogger